News details

News Category:Press Release

The Regional Water Resources Office 7 installed a 24-inch water pump at Ban Muang, Ban Pong District, to quickly drain water from agricultural areas, assisting over 162 households.

Published: Readers: 9 timesAgency: NINT 7

On October 7, 2026, Mr. Anan Phothiphan, Director of the Regional Water Resources Office 7, assigned the Mechanical Engineering Division to install a 24-inch water pump at Ban Muang, Village No. 2, Ban Muang Subdistrict, Ban Pong District, Ratchaburi Province. This was done to expedite water drainage from agricultural areas affected by accumulated water. This operation helped alleviate the suffering of 162 households, totaling 623 people, and effectively reduced potential damage to agricultural production in the area, under the "One Ministry of Natural Resources and Environment" approach.

News illustration

Tags:General news